PROJECT DETAILS

Location

Redwood City to San Jose, California

Client

Metropolitan Transportation Authority

Design Partners

Nelson Nygaard

Size

20 Miles

Status

Completed 2014

About this Project

Sherwood Design Engineers worked with Nelson Nygaard and the Metropolitan Transit Commission to analyze costs and benefits of Caltrans relinquishment of a 20 mile stretch of El Camino Real Boulevard between Redwood City and San Jose, California. Sherwood assessed existing conditions to estimate future costs of improving and maintaining the thoroughfare, including road paving, stormwater management, and ADA compliance. Estimating the future costs of assuming the thoroughfare helped local governments decide if the transition was financially feasible under their current operating plan(s).

SIMILAR PROJECTS