About this Project
Sherwood provided site civil engineering services through all phases of planning, design, and construction for the new administration building. Construction of the UC owned building within City limits required careful coordination between the City, University, DSA, and utility service providers during the design and approvals process. Water capture and reuse options were explored for stormwater management, but ultimately passive treatment through a long narrow raingarden was chosen. The project achieved LEED Gold status.