PROJECT DETAILS

Location

Santa Rosa, California

Client

Sonoma Academy

Design Partners

WRNS Studio
Integral Group
Interface Engineering
Mar Structural
Design XL

Size

Approx. 3 Acres

Status

Completed 2018

About this Project

Sherwood provided full site civil engineering design services from concept through construction for a new classroom building, maintenance structure, as well as site and utility improvements at Sonoma Academy. Sherwood explored rainwater and stormwater capture and on-site wastewater treatment for non-potable reuse. Following careful consideration of site location and constraints, Sherwood designed a system that harvests, stores, and treats roof and hardscape run-off. The treated water is reused in the new building’s toilet flushing. Sherwood’s system reduces the site area dedicated to stormwater mitigation measures, and provides a net reduction of municipal potable water used by the school. Sherwood’s grading, drainage, and utility design integrated the existing campus’s infrastructure seamlessly into the campus improvements.

SIMILAR PROJECTS