About this Project
The Civic Center Master Plan for the Town of Atherton is designed to preserve some of the town’s signature characteristics. This plan includes a great deal of improvements, such as site layout, traffic circulation, public right of way, streetscape design, the construction of new facilities, and more – all while accommodating the existing buildings and Caltrain station. Sherwood provided civil engineering services for road realignments, grading and drainage, public utility mains and service connections, an integrated stormwater management design, and construction documentation for the implementation of the master plan. In addition, Sherwood worked closely with the Calwater, SFPUC, and West Bay Sanitary District agencies to ensure clear alignment around site utilities.